If you symbolize a layer based on a date field and then change the way that date field is shown, 2013-03-07 vs 03/07/2013, via windows settings (http://help.arcgis.com/en/arcgisdesk...00000018000000) ArcMap doesnt recognize the the date anymore in the symbology.
Is there any work-around to this? I prefer a year first format, but have MXDs with that were created with mm/dd/yyyy windows settings. I hate to resymbolize everything. Why bother messing with a date field if ArcMap cant understand that 2013-03-07 = 03/07/2013?
Is there any work-around to this? I prefer a year first format, but have MXDs with that were created with mm/dd/yyyy windows settings. I hate to resymbolize everything. Why bother messing with a date field if ArcMap cant understand that 2013-03-07 = 03/07/2013?